Goto Section: 90.691 | 90.699 | Table of Contents

FCC 90.693
Revised as of October 1, 2006
Goto Year:2005 | 2007
Sec.  90.693   Grandfathering provisions for incumbent licensees.

   (a) General provisions. These provisions apply to “incumbent licensees,” all
   800 MHz licensees authorized in the 809–821/854–866 MHz band who obtained
   licenses or filed applications on or before December 15, 1995.

   (b) Spectrum blocks A through V. An incumbent licensee's service area shall
   be defined by its originally licensed 40 dBμV/m field strength contour and
   its interference contour shall be defined as its originally-licensed 22
   dBμV/m field strength contour. The “originally-licensed” contour shall be
   calculated using the maximum ERP and the actual height of the antenna above
   average terrain (HAAT) along each radial. Incumbent licensees are permitted
   to add, remove or modify transmitter sites within their original 22 dBμV/m
   field strength contour without prior notification to the Commission so long
   as their original 22 dBμV/m field strength contour is not expanded.
   Incumbent licensee protection extends only to its 40 dBμV/m signal strength
   contour. Pursuant to the minor modification notification procedures set
   forth in 1.947(b), the incumbent licensee must notify the Commission within
   30 days of any change in technical parameters for stations that are
   authorized under a waiver of 90.621(b)(4), or that are authorized under
   90.621(b)(5).

   (c) Special provisions for spectrum blocks F1 through V. Incumbent licensees
   that have received the consent of all affected parties or a certified
   frequency coordinator to utilize an 18 dBμV/m signal strength interference
   contour shall have their service area defined by their originally-licensed
   36 dBμV/m field strength contour and their interference contour shall be
   defined as their originally-licensed 18 dBμV/m field strength contour. The
   “originally-licensed” contour shall be calculated using the maximum ERP and
   the actual HAAT along each radial. Incumbent licensees seeking to utilize an
   18 dBμV/m signal strength interference contour shall first seek to obtain
   the consent of affected co-channel incumbents. When the consent of a
   co-channel licensee is withheld, an incumbent licensee may submit to any
   certified frequency coordinator an engineering study showing that
   interference will not occur, together with proof that the incumbent licensee
   has sought consent. Incumbent licensees are permitted to add, remove or
   modify transmitter sites within their original 18 dBμV/m field strength
   contour without prior notification to the Commission so long as their
   original 18 dBμV/m field strength contour is not expanded. Incumbent
   licensee protection extends only to its 36 dBμV/m signal strength contour.
   Pursuant to the minor modification notification procedures set forth in
   1.947(b), the incumbent licensee must notify the Commission within 30 days
   of any change in technical parameters for stations that are authorized under
   a waiver of 90.621(b)(4), or that are authorized under 90.621(b)(5).

   (d) Consolidated license—(1) Spectrum blocks A through V. Incumbent
   licensees operating at multiple sites may, after grant of EA licenses has
   been completed, exchange multiple site licenses for a single license,
   authorizing operations throughout the contiguous and overlapping 40 dB V/m
   field strength contours of the multiple sites. Incumbents exercising this
   license exchange option must submit specific information on Form 601 for
   each of their external base sites after the close of the 800 MHz SMR
   auction. The incumbent's geographic license area is defined by the
   contiguous and overlapping 22 dB V/m contours of its constructed and
   operational external base stations and interior sites that are constructed
   within the construction period applicable to the incumbent. Once the
   geographic license is issued, facilities that are added within an
   incumbent's existing footprint and that are not subject to prior approval by
   the Commission will not be subject to construction requirements.

   (2) Special Provisions for Spectrum Blocks F1 through V. Incumbent licensees
   that have received the consent of all affected parties or a certified
   frequency coordinator to utilize an 18 dB V/m signal strength interference
   contour operating at multiple sites may, after grant of EA licenses has been
   completed, exchange multiple site licenses for a single license. This single
   site license will authorize operations throughout the contiguous and
   overlapping 36 dB V/m field strength contours of the multiple sites.
   Incumbents exercising this license exchange option must submit specific
   information on Form 601 for each of their external base sites after the
   close of the 800 SMR auction. The incumbent's geographic license area is
   defined by the contiguous and overlapping 18 dB V/m contours of its
   constructed and operational external base stations and interior sites that
   are constructed within the construction period applicable to the incumbent.
   Once the geographic license is issued, facilities that are added within an
   incumbent's existing footprint and that are not subject to prior approval by
   the Commission will not be subject to construction requirements.

   [ 64 FR 71055 , Dec. 20, 1999, as amended at  69 FR 67852 , Nov. 22, 2004;  70 FR 6761 , Feb. 8, 2005;  70 FR 61062 , Oct. 20, 2005]


Goto Section: 90.691 | 90.699

Goto Year: 2005 | 2007
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public