Goto Section: 90.355 | 90.359 | Table of Contents

FCC 90.357
Revised as of October 1, 2006
Goto Year:2005 | 2007
Sec.  90.357   Frequencies for LMS systems in the 902–928 MHz band.

   (a) Multilateration LMS systems will be authorized on the following LMS
   sub-bands:


------------------------------------------------------------------------
               LMS Sub-band                       Forward Link \1\
------------------------------------------------------------------------
904.000-909.750 MHz.......................  927.750-928.000 MHz.
919.750-921.750 MHz \2\...................  927.500-927.750 MHz.
921.750-927.250 MHz.......................  927.250-927.500 MHz.
------------------------------------------------------------------------
\1\ Forward links for LMS systems may also be contained within the LMS
  sub-band. However, the maximum allowable power in these sub-bands is
  30 watts ERP in accordance with  Sec.  90.205(j).
\2\ The frequency band 919.750-921.750 MHz is shared co-equally between
  multilateration and non-multilateration LMS systems.

   (b) Non-multilateration LMS systems will be authorized on the following
   frequency bands:

   LMS Sub-band ^1 

   902.000–904.000 MHz

   909.750–921.750 MHz

   ^1 Applicants for non-multilateration LMS systems should request only the
   minimum amount of bandwidth necessary to meet their operational needs.

   [ 60 FR 15253 , Mar. 23, 1995, as amended at  60 FR 37277 , July 19, 1995]


Goto Section: 90.355 | 90.359

Goto Year: 2005 | 2007
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public