Sec. 15.307 Coordination with fixed microwave service.
(a) UTAM, Inc. is designated to coordinate and manage the transition of the
1910–1930 MHz band from the Private Operational-Fixed Microwave Service
(OFS) operating under part 101 of this chapter to unlicensed PCS operations,
(b) Each application for certification of equipment operating under the
provisions of this subpart must be accompanied by an affidavit from UTAM,
Inc. certifying that the applicant is a participating member of UTAM, Inc.
In the event a grantee fails to fulfill the obligations attendant to
participation in UTAM, Inc., the Commission may invoke administrative
sanctions as necessary to preclude continued marketing and installation of
devices covered by the grant of certification, including but not limited to
revoking certification.
(c) An application for certification of a PCS device that is deemed by UTAM,
Inc. to be noncoordinatable will not be accepted until the Commission
announces that a need for coordination no longer exists.
(d) A coordinatable PCS device is required to incorporate means that ensure
that it cannot be activated until its location has been coordinated by UTAM,
Inc. The application for certification shall contain an explanation of all
measures taken to prevent unauthorized operation. This explanation shall
include all procedural safeguards, such as the mandatory use of licensed
technicians to install the equipment, and a complete description of all
technical features controlling activation of the device.
(e) A coordinatable PCS device shall incorporate an automatic mechanism for
disabling operation in the event it is moved outside the geographic area
where its operation has been coordinated by UTAM, Inc. The application for
certification shall contain a full description of the safeguards against
unauthorized relocation and must satisfy the Commission that the safeguards
cannot be easily defeated.
(f) At such time as the Commission deems that the need for coordination
between unlicensed PCS operations and existing Part 101 Private
Operational-Fixed Microwave Services ceases to exist, the disabling
mechanism required by paragraph (e) of this section will no longer be
required.
(g) Operations under the provisions of this subpart are required to protect
systems in the Private Operational-Fixed Microwave Service operating within
the 1850–1990 MHz band until the dates and conditions specified in Sec. Sec. 101.69
through 101.73 of this chapter for termination of primary status.
Interference protection is not required for part 101 stations in this band
licensed on a secondary basis.
(h) The operator of a PCS device that is relocated from the coordinated area
specified by UTAM, Inc., must cease operating the device until coordination
for the new location is verified by UTAM, Inc.
[ 58 FR 59180 , Nov. 8, 1993, as amended at 59 FR 32852 , June 24, 1994; 60 FR 27425 , May 24, 1995; 61 FR 29689 , June 12, 1996]
Goto Section: 15.305 | 15.309
Goto Year: 2005 |
2007
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public